RAIL services to and from Gatwick airport will be subject to
disruption between July 27 and August 6 as Railtrack carries out engineering
work.
The Gatwick Express service between London and the airport
will run to a reduced timetable while local train operator Connex, which also
serves the airport, is advising travellers to expect timetable alterations.
Railtrack is repairing the line between Coulsdon South and
Redhill that was damaged in the extreme wet weather conditions last winter.